Smalland: Survive the Wilds is a game about small human beings in a dangerous way of insects. Players can survive in different weather conditions, fight against insects, build their own house and create things. There are a decent amount of items in the Smalland game, from clothes to decor elements in the house. As you progress, you will have to achieve technological perfection gradually. Smalland was created by the developers at Merge Games, who managed to provide players with a very impressive product.
Let’s talk about the resources of the flint era and the era of the crust, which will make it easier to pass and reach a new milestone in development. To find special types of resources, you will need to make a special tool that is assembled from insects. Crafted special tools and with the help of collected resources, you can make the best sets of armor.

In the Smalland game, resources are of great importance in character development and achievement in technological development. All resources can be divided into several types: collected resources (these are resources lying on the ground), natural resources (extracted from plants, resources from insects (can be obtained by defeating an insect) and produced resources. At the same time, food and medicine can be made from the collected resources , weapons, armor, build buildings and machines.
Level 3 resources. The flint era and the bark era, in the Smalland game.
Level 3 resources include resources that are mined using level 2 tools and stone weapons. The period of the third level takes place with the participation of the Skadi character, or rather, the fulfillment of the task from the Skadi character. It is in the area of \u200b\u200bthe Skadi character that resources related to the third level are located. The most basic Tier 3 resources are Flint and Bark, as well as Gecko Bones and Gecko Skin.
Tier 3 tool, flint era, in Smalland.
All tools and weapons made from Flint can be crafted at the Stone Cutting Machine. As for the level 3 armor, it can be crafted from the Skadi character. Before you start completing Skadi’s task, it is advisable to produce all types of weapons and tools where the resource “Silicon” is present in the recipe. For example, the Flint Sword and Flint Spear weapons, the Flint Axe, Flint Pick and Flint Shears tools. The Flint Shears tool will come in handy to get to level 4.
-
Flint axe.
A flint ax is crafted at the Stone Cutting Machine, using flint, resin and processed wood resources. With a lethal force of 60 units, the speed of cutting plants becomes much faster than when harvesting “Wooden Axe”. In addition to improved characteristics, “Flint Ax” allows you to cut down plants such as “Cattail”, “Foxtail” and “Sorrel”. Cattail and foxtail give an increased amount of Seeds resources, about 3 pieces can be obtained from one plant.
-
Flint pickaxe.
The Flint Pickaxe is a good tool that will allow you to mine the Bark resource. The lethal force is 50 units, and the durability of the tool is 400 units. It will require 5 Fiber, 5 Resin, 10 Silicon, and 5 Processed Wood to produce. Thanks to durability and lethal force, it becomes easier to extract simple resources such as “Stone”. In the future, with the help of the “Flint Pick” it will be possible to extract resources from scrap metal.
-
Flint shears.

Flint shears are a transitional tool for the next era. Since with the help of them you can open the cocoons of spiders and extract the Silk resource. The killing power is 40 units, and the durability is only 250 units, which is very low for collecting a good amount. You can produce the Flint Shears tool in the Stone Cutting Machine, for the resources fiber 5 units, resin 5 units, flint 8 units, and processed wood 5 units.
Weapon level 3, flint era, in the game Smalland.
-
Flint spear.
The flint spear is a very useful weapon that is used very often on the battlefield from level 3. The spear deals 16 to 22 damage with piercing attacks, and has a 5% chance of critical damage. Stamina consumption is 20 units, and durability is 240 units. Produce the weapon “Flint Spear” in the machine “Stone-cutting machine”, for 5 units of fiber, 4 units of resin, 8 units of silicon and 4 units of processed wood.
-
Flint sword.
The flint sword is a good slashing weapon, but rarely used due to the low number of hostile insects. The Flint Sword weapon deals 16 to 22 cutting damage, and has a 5% chance of inflicting a critical attack. Stamina consumption is 20 units, and durability is 240 units. Can be crafted at the Stonecutting Machine for 8 Resin, 10 Flint, and 4 Worked Wood. The closest suitable insects that the Flint Sword weapon is effective on are the Gecko and Bull Ant.
-
Bone club.
The Bone Mace is a melee weapon that deals bludgeoning damage, ranging from 16 to 22 units. There is a chance of a critical attack with a probability of 5%. Stamina consumption is 20 units, and durability is 160 units. It can be produced in the “Workbench” stark, for 1 unit of the resource “Bones”, 5 units of “Bark”, 5 units of “Amphibian Skin” and 3 units of “Resin”.
One of the disadvantages of the “Bone Mace” is its strength, only 160 units does not allow it to be used for a long time. For example, the Stone Hammer weapon has 234 durability, but slightly less damage. However, if not used often, then the weapon is very useful, until the appearance of the “Poison Mace”.
Extracted natural resources level 3 and their location, in the game Smalland.
Level 3 natural resources include: “Flint”, “Bark”, “Sorrel”. The listed resources belong to the third level because they are located in the area of the special mission, surrounded by strong hostile insects and are mined using a level 3 tool. The resources “Flint”, “Bark” and “Sorrel” can be collected in the area of the Skadi character, on the sandy shore.












